ESTABLISHED 1998

Empowering ConnectivityDatavision Cabling& Networking

The foundation of robust core banking infrastructure. Trusted by India’s leading financial institutions for over two decades.

Scroll

Trusted Institutional Partners

Kerala Gramin Bank
Kerala Gramin Bank22 Years
State Bank of India
State Bank of India8 Years
Union Bank of India
Union Bank of India15 Years
Canara Bank
Canara Bank10 Years

Founder's Legacy

“Building trust through precision engineering since 1981.” — Francis M.U.

1981

The Beginning

Joined BPL India

Specialized in Medical & Calibration instrumentation, laying the foundation for technical precision.

1984

Keltron Era

Consumer Electronics & Servers

Joined KELTRON during the boom of Indian electronics, working on state-of-the-art server systems.

1998

Pioneering Internet

SMGB Head Office

Installed the first Desktop PC & Email system at SMGB (now Kerala Gramin Bank) Head Office.

1999

Critical Infrastructure

IBM NT4 & 5KVA UPS

Successfully implemented the first IBM NT4 Server and 5KVA Online UPS infrastructure.

2015

Datavision Full-time

Retirement & Leadership

Retired from Keltron to dedicate full-time leadership to Datavision Cabling & Networking.

The Works Contract

Precision-engineered infrastructure solutions tailored for high-stakes environments. From banking cores to modern corporate hubs.

License HolderGrade B ContractorSCC (250 kW Capability)

Structured Data & Fiber

Fluke certified cabling solutions. End-to-end optical fiber implementation and maintenance.

  • Fluke Certified
  • OM3/OM4 Support
  • Cat6A Specialized

Server Room Setup

Deployment of IBM Rack/Blade servers, cold-aisle containment, and precision cooling setups.

  • IBM Partner Exp
  • Rack Management
  • Cable Dressing

Surveillance Systems

High-definition IP surveillance and centralized monitoring systems for banking institutions.

  • IP/Analog Hybrid
  • NVR Configuration
  • Remote Access

Electrification

Complete UPS, Inverter, and Earthing solutions. Designed for zero-downtime environments.

  • 5-50KVA Support
  • Chemical Earthing
  • DB Dressing